Case Studies
AstraZenca (Maryland) – Data Center Expansion
Challenge: Expand capacity for research workloads with minimal downtime.
Solution: Cat6a & fiber, rack/power design, cross‑connects, observability & security baselines.
- Zero unplanned downtime
- 35% faster dataset access
- Compliance‑ready documentation
ScoreCome (Virginia) – Emergency Network Restoration
Challenge: Core switch failure at remote DC impacting reporting SLAs.
Solution: On‑site within 90 minutes, replaced core switch, validated failover, coordinated with NOC.
- Restored in under 3 hours
- No data loss
- SLAs preserved
Mid‑Atlantic Colocation Rollout
Challenge: Consolidate office server rooms to a regional colo with better resilience and security.
Solution: Landing zone, cross‑connects, SD‑WAN, identity controls, backup/DR.
- 60% fewer outages
- 30% lower infra costs
- Auditable runbooks